- fix mistake in schdule time for planning chunks (must use start, not end of chunk)
- allow to configure the heuristics for pre-roll (time reserved for planning a node)
...observing multiple failures, which seem to be interconnected
- the test-setup with the planning chunk pre-roll is insufficient
- basically it is not possible to perform further concurrent planning,
without getting behind the actual schedule; at least in the setup
with DUMP print statements (which slowdown everything)
- muliple chained re-entrant calls into the planning function can result
- the **ASSERTION in the Allocator** was triggered again
- the log+stacktrace indicate that there **is still a Gap**
in the logic to protect the allocations via Grooming-Token
...causing the system to freeze due to excess memory allocation.
Fortunately it turned out this was not an error in the Scheduler core
or memory manager, but rather a sloppiness in the test scaffolding.
However, this incident highlights that the memory manager lacks some
sanity checks to prevent outright nonsensical allocation requests.
Moreover it became clear again that the allocation happens ''already before''
entering the Scheduler — and thus the existing sanity check comes too late.
Now I've used the same reasoning also for additional checks in the allocator,
limiting the Epoch increment to 3000 and the total memory allocation to 8GiB
Talking of Gibitbytes...
indeed we could use a shorthand notation for that purpose...