The problem with passing the deadline was just a blatant symptom
that something with the overall design was not quite right, leading
to mix-up of interfaces and implementation functions, and more and more
detail parameters spreading throughout the call chains.
The turning point was to realise the two conceptual levels
crossing and interconnected within the »Scheduler-Service«
- the Activity-Language describes the patterns of processing
- the Scheduler components handle time-bound events
So by turning the (previously private) queue entry into an
ActivationEvent, the design could be balanced.
This record becomes the common agens within the Scheduler,
and builds upon / layers on top of the common agens of the
Language, which is the Activity record.
This is the first kind of integration,
albeit still with a synthetic load.
- placed two excessive load peaks in the scheduling timeline
- verified load behaviour
- verified timings
- verified that the scheduler shuts down automatically when done
- sample distance to scheduler head whenever a worker asks for work
- moving average with N = worker-pool size and damp-factor 2
- multiply with the current concurrency fraction
as an aside, the header lib/test/microbenchmark.hpp
turns out to be prolific for this kind of investigation.
However, it is somewhat obnoxious that the »test subject«
must expose the signature <size_t(size_t)>.
Thus, with some metaprogramming magic, an generic adaptor
can be built to accept a range of typical alternatives,
and even the quite obvious signature void(void).
Since all these will be wrapped directly into a lambda,
the optimiser will remove these adaptations altogether.
- An important step towards a complete »Scheduler Service«
- Correct timing pattern could be verified in detail by tracing
- Spurred some further concept and design work regarding Load-control
- draft the duty cycle »tick«
- investigate corner cases of state updates and allocation managment
- implement start and forcible stop of the scheduler service
Obviously the better choice and a perfect fit for our requirements;
while the system-clock may jump and even move backwards on time service
adjustments, the steady clock just counts the ticks since last boot.
In libStdC++ both are implemented as int64_t and use nanoseconds resolution
- Ensure the grooming-token (lock) is reliably dropped
- also explicitly drop it prior to trageted sleeps
- properly signal when not able to acquire the token before dispatch
- amend tests broken by changes since yesterday
Notably the work-function is now completely covered, by adding
this last test, and the detailed investigations yesterday
ultimately unveiled nothing of concern; the times sum up.
Further reflection regarding the overall concept led me
to a surprising solution for the problem with priority classes.
...especially for the case »outgoing to sleep«
- reorganise switch-case to avoid falling through
- properly handle the tendedNext() predicate also in boundrary cases
- structure the decision logic clearer
- cover the new behaviour in test
Remark: when the queue falls empty, the scheduler now sends each
worker once into a targted re-shuffling delay, to ensure the
sleep-cycles are statistically evenly spaced
...there seemed to be an anomaly of 50...100µs
==> conclusion: this is due to the instrumentation code
- it largely caused by the EventLog, which was never meant
to be used in performance-critical code, and does hefty
heap allocations and string processing.
- moreover, there clearly is a cache-effect, adding a Factor 2
whenever some time passed since the last EventLog call
==> can be considered just an artifact of the test setup and
will have no impact on the scheduler
remark: this commit adds a lot of instrumentation code
To cover the visible behaviour of the work-Function,
we have to check an amalgam of timing delays and time differences.
This kind of test tends to be problematic, since timings are always
random and also machine dependent, and thus we need to produce pronounced effects
- organise by principles rather than implementing a mechanism
- keep the first version simple yet flexible
- conduct empiric research under synthetic load
Basic scheme:
- tend for next
- classify free capacity
- scattered targeted wait
The »Scheduler Service« will be assembled
from the components developed during the last months
- Layer-1
- Layer-2
- Activity-Language
- Block-Flow
- Work-Force