Commit graph

2 commits

Author SHA1 Message Date
fc0fcad4d6 Timeline: implement structure connections for sub-Tracks (closes: #1018)
This completes the initial implementation round for the TrackHead.
- arrangement and layout for nested sub-Tracks is now settled
- a graphical representation of scope nesting was implemented

Postponed for later...
- still some minor discrepancies on synchronisation of vertical space
  between TrackHead and custom drawing in the body (off-by-one?)
- Expanding / Collapsing of Tracks
- Implement actual Controls to influence the Scope, e.g. Volume, Mix-Mode
- Dynamically indicate selection and Muting on the structure display
2023-03-06 01:51:35 +01:00
fc74fbcd4f Timeline: complete integration of bracket drawing into the Layout
- pick up all relevant values from CSS
- also control the width of the StaveBracket
- observe the given overall height

Moreover, complete documentation drawing in Inkscape
and add a page to the TiddlyWiki, describing the principles
underlying this design and construction.
2023-03-05 04:00:49 +01:00