2baf058198 Scheduler: high-level schedule-Render-Job test complete 2023-11-09 04:04:53 +01:00
5c6354882d Scheduler: solve problem with transport from entrance-queue
The test case "scheduleRenderJob()" -- while deliberately operated
quite artificially with a disabled WorkForce (so the test can check
the contents in the queue and then progress manually -- led to discovery
of an open gap in the logic: in the (rare) case that a new task is
added ''from the outside'' without acquiring the Grooming-Token, then
the new task could sit in the entrace queue, in worst case for 50ms,
until the next Scheduler-»Tick« routinely sweeps this queue. Under
normal conditions however, each dispatch of another activity will
also sweep the entrance queue, yet if there happens to be no other
task right now, a new task could be stuck.

Thinking through this problem also helped to amend some aspects
of Grooming-Token handling and clarified the role of the API-functions.
2023-11-08 20:58:32 +01:00
892099412c Scheduler: integrate sanity check on timings
...especially to prevent a deadline way too far into the future,
since this would provoke the BlockFlow (epoch based) memory manager
to run out of space.

Just based on gut feeling, I am now imposing a limit of 20seconds,
which, given current parametrisation, with a minimum spacing of 6.6ms
and 500 Activities per Block would at maximum require 360 MiB for
the Activities, or 3000 Blocks. With *that much* blocks, the
linear search would degrade horribly anyway...
2023-11-07 18:37:20 +01:00
0ed7dba641 Scheduler: automatically step up capacity on new task
WorkForce scales down automatically after 2 seconds when
workers fall idle; thus we need to step up automatically
with each new task.

Later we'll also add some capacity management to both the
LoadController and the Job-Planning, but for now this rather
crude approach should suffice.

NOTE: most of the cases in SchedulerService_test verify parts
of the component integration and thus need to bypass this
automatism, because the test code wants to invoke the
work-Function directly (without any interference
from running workers)
2023-11-07 17:00:24 +01:00
8056bebf9c Scheduler: allow to manipulate nominal full capacity
While building increasingly complex integration tests for the Scheduler,
it turns out helpful to be able to manipulate the "full concurreency"
as used by Scheduler, WorkForce and LoadController.

In the current test, I am facing a problem that new entries from the
threadsafe entrance queue are not propagated to the priority queue
soon enough; partly this is due to functionality still to be added
(scaling up when new tasks are passed in) -- but this will further
complicate the test setup.
2023-11-07 16:12:56 +01:00
86a909b850 Scheduler: implement the render job builder
...simply by delegating to the underlying builder notation
on activity::Term as provided by the Activity-Language
2023-11-06 23:54:46 +01:00
86b90fbf84 Scheduler: draft high-level API for building a Job schedule
The invocation structure is effectively determined by the
Activity-chain builder from the Activity-Language; but, taking
into account the complexity of the Scheduler code developed thus far,
it seems prudent to encapsulate the topic of "Activities" altogether
and expose only a convenience builder-API towards the Job-Planning
2023-11-06 06:00:00 +01:00
72258c06bd Scheduler: reconciled into clearer design
The problem with passing the deadline was just a blatant symptom
that something with the overall design was not quite right, leading
to mix-up of interfaces and implementation functions, and more and more
detail parameters spreading throughout the call chains.

The turning point was to realise the two conceptual levels
crossing and interconnected within the »Scheduler-Service«

- the Activity-Language describes the patterns of processing
- the Scheduler components handle time-bound events

So by turning the (previously private) queue entry into an
ActivationEvent, the design could be balanced.
This record becomes the common agens within the Scheduler,
and builds upon / layers on top of the common agens of the
Language, which is the Activity record.
2023-11-04 04:49:13 +01:00
5c5dc40f3f Scheduler: processing of peak loads works
This is the first kind of integration,
albeit still with a synthetic load.

- placed two excessive load peaks in the scheduling timeline
- verified load behaviour
- verified timings
- verified that the scheduler shuts down automatically when done
2023-11-01 04:24:44 +01:00
4937577557 (WIP) instrumentation for investigation of sleep-behaviour 2023-11-01 02:06:02 +01:00
9f7711d26b Scheduler: complete and cover load indicator
- sample distance to scheduler head whenever a worker asks for work
- moving average with N = worker-pool size and damp-factor 2
- multiply with the current concurrency fraction
2023-10-31 02:29:50 +01:00
a087e52ab1 Scheduler: draft a load indicator
...using a state fusion
based on both the threadpool size and the average distance
or lag to the next task to be scheduled.
2023-10-30 20:22:06 +01:00
6a7a2832bf Scheduler: simplify usage of microbenchmark helper
as an aside, the header lib/test/microbenchmark.hpp
turns out to be prolific for this kind of investigation.

However, it is somewhat obnoxious that the »test subject«
must expose the signature <size_t(size_t)>.

Thus, with some metaprogramming magic, an generic adaptor
can be built to accept a range of typical alternatives,
and even the quite obvious signature void(void).
Since all these will be wrapped directly into a lambda,
the optimiser will remove these adaptations altogether.
2023-10-30 20:17:16 +01:00
4fada4225c Scheduler: watch behaviour under load
- create a synthetic load peak while operating with full WorkForce
- Goal is to develop a load indicator
2023-10-30 05:09:41 +01:00
22b4a9e4b2 Scheduler: start and shutdown implemented and demonstrated in test
- An important step towards a complete »Scheduler Service«
- Correct timing pattern could be verified in detail by tracing
- Spurred some further concept and design work regarding Load-control
2023-10-29 20:06:41 +01:00
8505059476 Scheduler: consider how to maintain active state
- draft the duty cycle »tick«
- investigate corner cases of state updates and allocation managment
- implement start and forcible stop of the scheduler service
2023-10-29 04:22:42 +01:00
4e9d54e6f9 Scheduler: switch to steady-clock
Obviously the better choice and a perfect fit for our requirements;
while the system-clock may jump and even move backwards on time service
adjustments, the steady clock just counts the ticks since last boot.

In libStdC++ both are implemented as int64_t and use nanoseconds resolution
2023-10-28 20:58:37 +02:00
6166ab63f2 Scheduler: complete handling of the grooming-token
- Ensure the grooming-token (lock) is reliably dropped
- also explicitly drop it prior to trageted sleeps
- properly signal when not able to acquire the token before dispatch

- amend tests broken by changes since yesterday
2023-10-28 05:35:35 +02:00
552d8dec0e Scheduler: complete work-Function / conception work
Notably the work-function is now completely covered, by adding
this last test, and the detailed investigations yesterday
ultimately unveiled nothing of concern; the times sum up.

Further reflection regarding the overall concept led me
to a surprising solution for the problem with priority classes.
2023-10-28 05:34:56 +02:00
e26d251867 Scheduler: rationalise delay decision logic
...especially for the case »outgoing to sleep«

- reorganise switch-case to avoid falling through
- properly handle the tendedNext() predicate also in boundrary cases
- structure the decision logic clearer
- cover the new behaviour in test

Remark: when the queue falls empty, the scheduler now sends each
worker once into a targted re-shuffling delay, to ensure the
sleep-cycles are statistically evenly spaced
2023-10-28 05:34:56 +02:00
b5e9d67a79 Scheduler: wrap-up and comment test cases thus far
...up to now, Behaviour is as expected
- with some minor discrepancies still to be fixed
- and an effect due to the test-scaffolding
2023-10-27 03:37:24 +02:00
097001d16f Scheduler: investigate timings of dispatch()
...there seemed to be an anomaly of 50...100µs

==> conclusion: this is due to the instrumentation code
    - it largely caused by the EventLog, which was never meant
      to be used in performance-critical code, and does hefty
      heap allocations and string processing.
    - moreover, there clearly is a cache-effect, adding a Factor 2
      whenever some time passed since the last EventLog call

==> can be considered just an artifact of the test setup and
    will have no impact on the scheduler


remark: this commit adds a lot of instrumentation code
2023-10-27 02:53:34 +02:00
a90a5d9636 Scheduler: can demonstrate basic behaviour
- invoked right away
- pre-sleep to tend next
- post-sleep if next activity follows at a distance
2023-10-26 03:56:18 +02:00
a71bcaae43 Scheduler: shorthand notation for work-Function test
To cover the visible behaviour of the work-Function,
we have to check an amalgam of timing delays and time differences.

This kind of test tends to be problematic, since timings are always
random and also machine dependent, and thus we need to produce pronounced effects
2023-10-26 01:14:13 +02:00
5164ead929 Scheduler: access invocation time for test
...find a way to sneak out the "now" parameter passed on Invocation
...this is prerequisite to demonstrate expected behaviour of the work-Function
2023-10-25 23:40:47 +02:00
7da88b772f Scheduler: setup to verify the work-Function
...first steps to get anything to run with the Scheduler constructed thus far
...can now
 - enqueue
 - getWork -> invoke
2023-10-25 17:31:32 +02:00
e5638119f5 Scheduler: devise scheme for load control
- organise by principles rather than implementing a mechanism
- keep the first version simple yet flexible
- conduct empiric research under synthetic load

Basic scheme:
- tend for next
- classify free capacity
- scattered targeted wait
2023-10-22 16:45:13 +02:00
74c97614b3 Scheduler: component wiring
The »Scheduler Service« will be assembled
from the components developed during the last months
- Layer-1
- Layer-2
- Activity-Language
- Block-Flow
- Work-Force
2023-10-20 04:36:07 +02:00
9db341bd8b Scheduler: plan for integration
identified three distinct tasks
- build the external API
- establish component integration
- performance testing
2023-10-20 00:59:50 +02:00