lumiera_/doc/devel/dump/2024-04-08.Scheduler-LoadTest/Topo-21.svg
Ichthyostega 177e241060 Scheduler-test: investigate extended loads with different patterns
The behaviour seems consistent and the schedule breaks at the expected point.
At first sight, concurrency seems slightly to low; detailed investigation
however shows that this is due to the structure of the load graph,
and in fact the run time comes close to optimal values.
2024-04-18 01:39:28 +02:00

992 lines
61 KiB
XML