This is the first kind of integration, albeit still with a synthetic load. - placed two excessive load peaks in the scheduling timeline - verified load behaviour - verified timings - verified that the scheduler shuts down automatically when done |
||
|---|---|---|
| .. | ||
| gear | ||
| mem | ||
| DIR_INFO | ||