This is the first kind of integration, albeit still with a synthetic load. - placed two excessive load peaks in the scheduling timeline - verified load behaviour - verified timings - verified that the scheduler shuts down automatically when done |
||
|---|---|---|
| .. | ||
| draw | ||
| DIR_INFO | ||
| empty.html | ||
| InterfaceConcept_Varga.mm | ||
| renderengine.html | ||
| thinkPad.ichthyo.mm | ||
| uml | ||
| workflow.mm | ||