- test setup without actual scheduler - wire the callbacks such to verify + all nodes are touched + levels are processed to completion + the planning chunk stops at the expected level + all node dependencies are properly reported through the callbacks |
||
|---|---|---|
| .. | ||
| draw | ||
| DIR_INFO | ||
| empty.html | ||
| InterfaceConcept_Varga.mm | ||
| renderengine.html | ||
| thinkPad.ichthyo.mm | ||
| uml | ||
| workflow.mm | ||