...observing multiple failures, which seem to be interconnected - the test-setup with the planning chunk pre-roll is insufficient - basically it is not possible to perform further concurrent planning, without getting behind the actual schedule; at least in the setup with DUMP print statements (which slowdown everything) - muliple chained re-entrant calls into the planning function can result - the **ASSERTION in the Allocator** was triggered again - the log+stacktrace indicate that there **is still a Gap** in the logic to protect the allocations via Grooming-Token |
||
|---|---|---|
| .. | ||
| draw | ||
| DIR_INFO | ||
| empty.html | ||
| InterfaceConcept_Varga.mm | ||
| renderengine.html | ||
| thinkPad.ichthyo.mm | ||
| uml | ||
| workflow.mm | ||