lumiera_/doc/devel/dump/2023-12-09.Scheduler-Integration
Ichthyostega 67036f45b0 Scheduler-test: Integration-test now running smoothly
The last round of refactorings yielded significant improvements
 - parallelisation now works as expected
 - processing progresses closer to the schedule
 - run time was reduced

The processing load for this test is tuned in a way to overload the
scheduler massively at the end -- the result must be correct non the less.

There was one notable glitch with an assertion failure from the memory manager.
Hopefully I can reproduce this by pressing and overloading the Scheduler more...
2023-12-18 23:34:10 +01:00
..
Dump-01 Scheduler-test: investigate processing patterns 2023-12-09 04:30:35 +01:00
Dump-02 Scheduler-test: investigate processing patterns 2023-12-09 04:30:35 +01:00
Dump-03 Scheduler-test: investigate processing patterns 2023-12-09 04:30:35 +01:00
Dump-04 Scheduler-test: ''can demonstrate running a synthetic load'' (closes #1346) 2023-12-11 23:53:25 +01:00
Dump-05 Scheduler-test: Integration-test now running smoothly 2023-12-18 23:34:10 +01:00
index.txt Scheduler-test: Integration-test now running smoothly 2023-12-18 23:34:10 +01:00
SchedulerTestGraph.pdf Scheduler-test: ''can demonstrate running a synthetic load'' (closes #1346) 2023-12-11 23:53:25 +01:00