basically we'll establish a collaboration where both sides know only the interface (contract) of the partner; a safe margin for allocation size has to be established through metaprogramming (TODO) |
||
|---|---|---|
| .. | ||
| draw | ||
| DIR_INFO | ||
| empty.html | ||
| InterfaceConcept_Varga.mm | ||
| renderengine.html | ||
| thinkPad.ichthyo.mm | ||
| uml | ||
| workflow.mm | ||