Author SHA1 Message Date
177e241060 Scheduler-test: investigate extended loads with different patterns
The behaviour seems consistent and the schedule breaks at the expected point.
At first sight, concurrency seems slightly to low; detailed investigation
however shows that this is due to the structure of the load graph,
and in fact the run time comes close to optimal values.
2024-04-18 01:39:28 +02:00
c934e7f079 Scheduler-test: reduce impact of scale adjustments on breakpoint-search
the `BreakingPoint` tool conducts a binary search to find the ''stress factor''
where a given schedule breaks. There are some known deviations related to the
measurement setup, which unfortunately impact the interpretation of the
''stress factor'' scale. Earlier, an attempt was made, to watch those factors
empirically and work a ''form factor'' into the ''effective stress factor''
used to guide this measurement method.

Closer investigation with extended and elastic load patters now revealed
a strong tendency of the Scheduler to scale down the work resources when not
fully loaded. This may be mistaken by the above mentioned adjustments as a sign
of a structural limiation of the possible concurrency.

Thus, as a mitigation, those adjustments are now only performed at the
beginning of the measurement series, and also only when the stress factor
is high (implying that the scheduler is actually overloaded and thus has
no incentive for scaling down).

These observations indicate that the »Breaking Point« search must be taken
with a grain of salt: Especially when the test load does ''not'' contain
a high degree of inter dependencies, it will be ''stretched elastically''
rather than outright broken. And under such circumstances, this measurement
actually gauges the Scheduler's ability to comply to an established
load and computation goal.
2024-04-18 01:39:27 +02:00
1d4f6afd18 Scheduler-test: complete and document the Load-peak tests
- use parameters known to produce a clean linear model
- assert on properties of this linear model

Add extended documentation into the !TiddlyWiki,
with a textual account of the various findings,
also including some of the images and diagrams,
rendered as SVG
2024-04-12 02:23:31 +02:00
1316ee2c7f Scheduler-test: adjust contention mitigation as result of testing
Investigate the behaviour over a wider range of job loads,
job count and worker pool sizes. Seemingly the processing
can not fully utilise the available worker pool capacity.

By inspection of trace-dumps, one impeding mechanism could
be identified: the »stickiness« of the contention mitigation.
Whenever a worker encounters repeated contention, it steps up
and adds more and more wait cycles to remove pressure from the
schedule coordination. As such this is fine and prevents further
degradation of performance by repeated atomic synchronisation.
However, this throttling was kept up needlessly after further
successful work-pulls. Since job times of several milliseconds
can be expected on average in media processing, such a long
retention would spread a performance degradation over a duration
of several frames. Thus, the scheme for step-down was changed
to decrease the throttling by a power series rather than just
documenting the level.
2024-04-12 02:23:31 +02:00
a6a9155cd9 Scheduler-test: measurements documented 2024-04-09 17:10:21 +02:00
29699991a0 Scheduler-test: watch statistics with increasing stress
- repeated invocations of the same test setup for statistics
- the usual nasty 64-node graph with massive fork out
- limit concurrency to 4 cores
- tabulate data to look for clues regarding a trigger criteria

Hypothesis: The Scheduler slips off schedule when all of the
following three criteria are met:
- more than 55% glitches with Δ > 2ms
- σ > 2ms
- ∅Δ > 4ms
2024-01-02 18:44:20 +01:00
f04035a030 Scheduler-test: draft calculation of level-weight based schedule
...the idea is to use the sum of node weights per level
to create a schedule, which more closely reflects the distribution
of actual computation time. Hopefully such a schedule can then be
squeezed or stretched by a time factor to find out a ''breaking point'',
at which the Scheduler is no longer able to keep up.
2023-12-29 01:07:26 +01:00
67036f45b0 Scheduler-test: Integration-test now running smoothly
The last round of refactorings yielded significant improvements
 - parallelisation now works as expected
 - processing progresses closer to the schedule
 - run time was reduced

The processing load for this test is tuned in a way to overload the
scheduler massively at the end -- the result must be correct non the less.

There was one notable glitch with an assertion failure from the memory manager.
Hopefully I can reproduce this by pressing and overloading the Scheduler more...
2023-12-18 23:34:10 +01:00
da57e3dfcd Scheduler-test: ''can demonstrate running a synthetic load'' (closes #1346)
* added benchmark over synchronous execution as point of reference
 * verified running times and execution pattern
 * Scheduler **behaves as expected** for this example
2023-12-11 23:53:25 +01:00
7847e3156c Scheduler-test: investigate processing patterns
Some test-runs performed excitingly smooth,
but in one case the processing was was drastically delayed,
due to heavy contention. The relevance of this incident is not clear yet,
since this test run uses a rather atypical load with very short actual work jobs.

Anyway, the dump-logs are documented with this commit.
2023-12-09 04:30:35 +01:00