54e489b9b6 Scheduler-test: define criterion for breaking point
This statistical criterion defines when to count observed Scheduler performance
as loosing control. The test is comprised of three observations, which
all must be confirmed:

- an individual run counts as accidentally failed when the execution slips
  away by more than 2ms with respect to the defined overall schedule.
  When more than 55% of all observed runs are considered as failed,
  the first condition is met
- moreover, the observed standard derivation must also surpass the
  same limit of > 2ms, which indicates that the Scheduling mechanism
  is under substantial strain (on average, the slip is ~ 200µs)
- the third condition is that the ''averaged delta'' has surpassed
  4ms, which is 2 times the basic failure indicator.

These conditions are based on watching the Scheduler in operation;
typically all three conditions slip away by large margin after a
very narrow yet critical increase in the stress level.

Using three conditions together should improve robustness; often
the problems to keep up with the schedule build up over some parameter
range, yet the actual decision should be based on complete loss of control.
2024-01-03 21:11:20 +01:00
fda34a42ca Scheduler-test: incorporate statistics computation
adapt the code written yesterday explicitly for the test case
into the new framework for performing a stress-test run.
Notable difference: times converted to millisecond immediately
2024-01-03 16:27:07 +01:00
e704f4aae0 Scheduler-test: build configurable measurement setup
Elaborate the draft to include all the elements used directly in the test case thus far;
the goal is to introduce some structuring and leave room for flexible confguration,
while implementing the actual binary search as library function over Lambdas.

My expectation is to write a series of individual test instances with varying parameters;
while it seems possible to add further performance test variations into that scheme later on.
2024-01-03 02:18:15 +01:00
6f4bd150fd Scheduler-test: draft a structure to formalise these investigations
- the goal is to run a binary search
- the search condition should be factored out
- thus some kind of framework or DSL is required,
  to separate the technicalities of the measurement
  from the specifics of the actual test case.
2024-01-03 00:45:17 +01:00
29699991a0 Scheduler-test: watch statistics with increasing stress
- repeated invocations of the same test setup for statistics
- the usual nasty 64-node graph with massive fork out
- limit concurrency to 4 cores
- tabulate data to look for clues regarding a trigger criteria

Hypothesis: The Scheduler slips off schedule when all of the
following three criteria are met:
- more than 55% glitches with Δ > 2ms
- σ > 2ms
- ∅Δ > 4ms
2024-01-02 18:44:20 +01:00
a56afbaf62 Scheduler-test: bugfix in computation-load
...this one was quite silly: obviously we need a separate instance
of the memory block ''per invocation'', otherwise concurrent invocations
would corrupt each other's allocation. The whole point of this variant
of the computation-load is to access a ''private'' memory block...
2024-01-02 16:24:24 +01:00
0c9485294e Scheduler-test: experiment with varying stress levels 2024-01-02 15:45:40 +01:00
bb2bbc0e02 Scheduler-test: verify adapted schedule with stress-factor
- schedule can now be adapted to concurrency and expected distribution of runtimes
- additional stress factor to press the schedule (1.0 is nominal speed)
- observed run-time now without Scheduler start-up and pre-roll
- document and verify computed numbers
2024-01-02 00:24:28 +01:00
813f8721f7 Scheduler-test: build adapted schedule
...based on the adapted time-factor sequence
implemented yesterday in TestChainLoad itself

- in this case, the TimeBase from the computation load is used as level speed
- this »base beat« is then modulated by the timing factor sequence
- working in an additional stress factor to press the schedule uniformly
- actual start time will be added as offset once the actual test commences
2024-01-01 22:48:27 +01:00
f4dd309476 Scheduler-test: change test setup to use a schedule table
...up to now, we've relied on a regular schedule governed solely
by the progression of node levels, with a fixed level speed
defaulting to 1ms per level.

But in preparation of stress tesging, we need a schedule adapted
to the expected distribution of computation times, otherwise
we'll not be able to factor out the actual computation graph
connectivity. The goal is to establish a distinctive
**breaking point** when the scheduler is unable to cope with
the provided schedule.
2024-01-01 21:07:16 +01:00
55cb028abf Scheduler-test: document and verify weight adapted timing
The helper developed thus far produces a sequence of
weight factors per level, which could then be multiplied
with an actual delay base time to produce a concrete schedule.

These calculations, while simple, are difficult to understand;
recommended to use the values tabulated in this test together
with a `graphviz` rendering of the node graph (🠲 `printTopologyDOT()`)
2023-12-31 21:59:41 +01:00
e9e7d954b1 Scheduler-test: formula to guess expense
The intention is to establish a theoretical limit for the expense,
given some degree of concurrency. In reality, the expense should always
be greater, since the time is not just split by the number of cores;
rather we need to chain up existing jobs of various weight on the available
cores (which is a special case of the box packing problem).

With this formula, an ideal weight factor can be determined for each level,
and then summing up the sequence of levels gives us a guess for a sensible
timing for the overall scheduler
2023-12-31 03:14:59 +01:00
409a60238a Scheduler-test: extract a generic grouping iterator
...so IterExplorer got yet another processing layer,
which uses the grouping mechanics developed yesterday,
but is freely configurable through λ-Functions.

At actual usage sit in TestChainLoad, now only the actual
aggregation computation must be supplied, and follow-up computations
can now be chained up easily as further transformation layers.
2023-12-31 00:41:01 +01:00
fec117039e Scheduler-test: need this group aggregation as pipeline rather
Yesterday I've written a simple loop-based implementation of
a grouping aggregation to count the node weights per level.

Unfortunately it turns out we'll use several flavours of this
and we'd have to chain up postprocessing -- thus from a usage perspective
it would be better to have the same functionality packaged as interator pipeline.
This turns out to be surprisingly tricky and there is no suitable library
function available, which means I'll have to write one myself.

This changeset is the first step into this direction: reformulate
the simple for-loop into a demand-driven grouping iterator
2023-12-30 02:15:38 +01:00
f04035a030 Scheduler-test: draft calculation of level-weight based schedule
...the idea is to use the sum of node weights per level
to create a schedule, which more closely reflects the distribution
of actual computation time. Hopefully such a schedule can then be
squeezed or stretched by a time factor to find out a ''breaking point'',
at which the Scheduler is no longer able to keep up.
2023-12-29 01:07:26 +01:00
47ae4f237c Scheduler-test: investigate and fix further memory manager problem
In-depth investigation and reasoning highlighted another problem,
which could lead to memory corruption in rare cases; in the end
I found a solution by caching the ''address'' of the current Epoch
and re-validating this address on each Epoch-overflow.

After some difficulties getting any reliable measurement for a Release-build,
it turned out that this solution even ''improves performance by 22%''

Remark-1: the static blockFlow::Config prevents simple measurements by
  just recompiling one translation unit; it is necessary to build the
  relevant parts of Vault-layer with optimisation to get reliable numbers

Remark-2: performing a full non-DEBUG build highlighted two missing
  header-inclusions to allow for the necessary template specialisations.
2023-12-28 02:13:24 +01:00
3716a5b3d4 Scheduler-test: address defects in memory manager
...discovered by during investigation of latest Scheduler failures.
The root of the problems is that block overflow can potentially trigger
expansion of the allocation pool. Under some circumstances, this on-the fly
allocation requires a rotation of index slots, thereby invalidating
existing iterators.

While such behaviour is not uncommon with storage data structures (see std::vector),
in this case it turns out problematic because due to performance considerations,
a usage pattern emerged which exploits re-using existing storage »Slots« with known
deadline. This optimisation seems to have significant leverage on the
planning jobs, which happen to allocated and arrange a whole strike of
Activities with similar deadlines.

One of these problem situations can easily be fixed, since it is triggered
through the iterator itself, using a delegate function to request a storage expansion,
at which point the iterator is able to re-link and fix its internal index.
This solution also has no tangible performance implications in optimised code.

Unfortunately there remains one obscure corner case where such an pool expansion
could also have invalidated other iterators, which are then used later to
attach dependency relations; even a partial fix for that problem seems
to cause considerable performance cost of about -14% in optimised code.
2023-12-27 00:16:03 +01:00
af680cdfd9 Scheduler-test: adapt tests to changed logic at entrance
- now there can not be any direct dispatch anymore when entering events
- thus there is no decision logic at entrance anymore
- rather the work-function implementation moved down into Layer-2
- so add a unit-test like coverage there (integration in SchedulerService_test)
2023-12-27 00:16:03 +01:00
09f0e92ea3 Scheduler-test: reorganise planning-job entrance and coordination
This amounts to a rather massive refactoring, prompted by the enduring problems
observed when pressing the scheduler. All the various glitches and (fixed) crashes
are related to the way how planning-jobs enter the schedule items,
which is also closely tied to the difficulties getting the locking
for planning-jobs correct.

The solution pursued hereby is to reorder the main avenues into the
scheduler implementation. There is now a streamlined main entrance,
which **always** enqueues only, allowing to omit most checks and
coordination. On the other hand, the complete coordination and dispatch
of the work capacity is now shifted down into the SchedulerCommutator,
thereby linking all coordination and access control close together
into a single implementation facility.

If this works out as intended
 - several repeated checks on the Grooming-Token could be omitted (performance)
 - the planning-job would no longer be able to loose / drop the Token,
   thereby running enforcedly single-threaded (as was the original intention)
 - since all planning effectively originates from planning-jobs, this
   would allow to omit many safety barriers and complexities at the
   scheduler entrance avenue, since now all entries just go into the queue.

WIP: tests pass compiler, but must be adapted / reworked
2023-12-26 03:06:30 +01:00
dedfbf4984 Scheduler-test: investigate planning failure
- fix mistake in schdule time for planning chunks (must use start, not end of chunk)
- allow to configure the heuristics for pre-roll (time reserved for planning a node)
2023-12-23 21:38:51 +01:00
90ab20be61 Scheduler-test: press harder with long and massive graph
...observing multiple failures, which seem to be interconnected

- the test-setup with the planning chunk pre-roll is insufficient

- basically it is not possible to perform further concurrent planning,
  without getting behind the actual schedule; at least in the setup
  with DUMP print statements (which slowdown everything)

- muliple chained re-entrant calls into the planning function can result

- the **ASSERTION in the Allocator** was triggered again

- the log+stacktrace indicate that there **is still a Gap**
  in the logic to protect the allocations via Grooming-Token
2023-12-22 00:33:51 +01:00
2cd51fa714 Scheduler-test: fix out-of-bound access
...causing the system to freeze due to excess memory allocation.

Fortunately it turned out this was not an error in the Scheduler core
or memory manager, but rather a sloppiness in the test scaffolding.
However, this incident highlights that the memory manager lacks some
sanity checks to prevent outright nonsensical allocation requests.

Moreover it became clear again that the allocation happens ''already before''
entering the Scheduler — and thus the existing sanity check comes too late.
Now I've used the same reasoning also for additional checks in the allocator,
limiting the Epoch increment to 3000 and the total memory allocation to 8GiB

Talking of Gibitbytes...
indeed we could use a shorthand notation for that purpose...
2023-12-21 20:25:43 +01:00
707fbc2933 Scheduler-test: implement contention mitigation scheme
while my basic assessment is still that contention will not play a significant
role given the expected real world usage scenario — when testing with
tighter schedule and rather short jobs (500µs), some phases of massive contention
can be observed, leading to significant slow-down of the test.

The major problem seems to be that extended phases of contention will
effectively cause several workers to remain in an active spinning-loop for
multiple microseconds, while also permanently reading the atomic lock.

Thus an adaptive scheme is introduced: after some repeated contention events,
workers now throttle down by themselves, with polling delays increased
with exponential stepping up to 2ms. This turns out to be surprisingly
effective and completely removes any observed delays in the test setup.
2023-12-20 20:25:17 +01:00
b497980522 Scheduler-test: guard memory allocations by grooming-token
Turns out that we need to implemented fine grained and explicit handling logic
to ensure that Activity planning only ever happens protected by the Grooming-Token.
This is in accordance to the original design, which dictates that all management tasks
must be done in »management mode«, which can only be entered by a single thread at a time.
The underlying assumption is that the effort for management work is dwarfed in comparison
to any media calculation work.

However, in
5c6354882d
...I discovered an insidious border condition, an in an attempt to fix it,
I broke that fundamental assumpton. The problem arises from the fact that we
do want to expose a *public API* of the Scheduler. Even while this is only used
to ''seed'' a calculation stream, because any further planning- and management work
will be performed by the workers themselves (this is a design decision, we do not
employ a "scheduler thread")
Anyway, since the Scheduler API ''is'' public, ''someone from the outside'' could
invoke those functions, and — unaware of any Scheduler internals — will
automatically acquire the Grooming-Token, yet never release it,
leading to deadlock.

So we need a dedicated solution, which is hereby implemented as a
scoped guard: in the standard case, the caller is a management-job and
thus already holds the token (and nothing must be done). But in the
rare case of an »outsider«, this guard now ''transparently'' acquires
the token (possibly with a blocking wait) and ''drops it when leaving scope''
2023-12-19 23:38:57 +01:00
f526360319 Scheduler-test: retract support for ''self-inhibition''
...this feature seems to be no longer necessary now;
leaving the actual implementation in-code for the time being,
but removed it from the public access API.
2023-12-19 21:07:33 +01:00
c4807abf8a Scheduler-test: planning for stress-tests 2023-12-19 21:06:23 +01:00
67036f45b0 Scheduler-test: Integration-test now running smoothly
The last round of refactorings yielded significant improvements
 - parallelisation now works as expected
 - processing progresses closer to the schedule
 - run time was reduced

The processing load for this test is tuned in a way to overload the
scheduler massively at the end -- the result must be correct non the less.

There was one notable glitch with an assertion failure from the memory manager.
Hopefully I can reproduce this by pressing and overloading the Scheduler more...
2023-12-18 23:34:10 +01:00
ba82a446fd Scheduler-test: address follow-up problem with depth-first
The rework from yesterday turned out to be effective ... unfortunately
a bit to much: since now late follow-up notifications take precedence,
a single worker tends to process the complete chain depth-first, because
the first chain will be followed and processed, even before the worker
was able to post the tasks for the other branches. Thus this single
worker is the only one to get a chance to proceed.

After some consideration, I am now leaning towards a fundamental change,
instead of just fixing some unfavourable behaviour pattern: while the
language semantics remains the same, the scheduler should no longer
directly dispatch into the next chain **from λ-post**. That is, whenever
a POST / NOTIFY is issued from the Activity-chain, the scheduler goes
through prioritisation.

This has further ramifications: we do not need a self-inhibition mechanism
any more (since now NOTIFY picks up the schedule time of the target).

With these changes, processing seems to proceed more smoothly,
albeit still with lots of contention on the Grooming token,
at least in the example structure tested here.
2023-12-17 23:46:44 +01:00
1cbb6b7371 Scheduler-test: rework handling of notifications in the Activity-Language
While the recent refactoring...
206c67cc

...was a step into the right direction, it pushed too hard,
overlooking the requirement to protect the scheduler contents
and thus all of the Activity-chains against concurrent modification.
Moreover, the recent solution still seems not quite orthogonal.

Thus the handling of notifications was thoroughly reworked:
- the explicit "double-dispatch" was removed, since actual usage
  of the language indicates that we only need notifications to
  Gate (and Hook), but not to any other conceivable Activity.
- thus it seems unnecessary to turn "notification" into some kind
  of secondary work mode. Rather, it is folded as special case
  into the regular dispatch.

This leads to new processing rules:
- a POST goes into λ-post (obviously... that's its meaning)
- a NOTIFY now passes its *target* into λ-post
- λ-post invokes ''dispatch''
- and **dispatching a Gate now implies to notify the Gate**

This greatly simplifies the »state machine« in the Activity-Language,
but also incurs some limitations (which seems adequate, since it is
now clear that we do not ''schedule'' or ''dispatch'' arbitrary
Activities — rather we'll do this only with POST and NOTIFY,
and all further processing happens by passing activation
along the chain, without involving the Scheduler)
2023-12-16 23:47:50 +01:00
75b5eea2d3 Scheduler-test: option to require activation by scheduler
use a feature of the Activity-Language prepared for this purpose:
self-Inhibition of the Chain. This prevents a prerequisite-NOTIFY
to trigger a complete chain of available tasks, before these tasks
have actually reached their nominal scheduling time.

This has the effect to align the computations much more strictly
with the defined schedule
2023-12-14 01:49:46 +01:00
3e84224f74 Scheduler-test: force dependency-wait to wake-up job
The main (test) thread is kept in a blocking wait until the
planned schedule is completed. If however the schedule overruns,
the wake-up job could just be triggered prematurely.

This can easily be prevented by adding a dependency from the last
computation job to the wake-up job. If the computation somehow
flounders, the SAFETY_TIMEOUT (5s) will eventually raise
an exception to let the test fail cleanly (shutting down
the Scheduler automatically)
2023-12-13 22:55:28 +01:00
206c67cc8a Scheduler-test: adapt λ-post to include deadline info
...it seems impossible to solve this conundrum other than by
opening a path to override a contextual deadline setting from
within the core Activity-Language logic.

This will be used in two cases
 - when processing a explicitly coded POST (using deadline from the POST)
 - after successfully opening a Gate by NOTIFY (using deadline from Gate)

All other cases can now supply Time::NEVER, thereby indicating that
the processing layer shall use contextual information (intersection
of the time intervals)
2023-12-13 19:42:38 +01:00
3bf3ca095b Scheduler-test: failure of extended cascading notifications
...this is an interesting test failure, which highlights inconsistencies
with handling of deadlines when processing follow-up from NOTIFY-triggers

There was also some fuzziness related to the ''meaning'' of λ-post,
leading to at least one superfluous POST invocation for each propagation;
fixing this does not solve the problem yet removes unnecessary overhead
and lock-contention
2023-12-13 19:27:45 +01:00
fcde92a476 Scheduler-test: add node-weight statistics
...playing around with the graph for the Scheduler integration test
...single threaded run time seemed to behave irregular
...but in fact it is very close to what can be expected
   based on an ''averaged node weight''

Fortunately its very simple to add that into the existing node statistics
2023-12-12 20:51:31 +01:00
eef3525710 Scheduler-test: setup for integration test
Basically this is all done and settled already: this is the `usageExample()`
from `TestChainLoadTest`. However, the focus is slightly different here:
We want a demonstration that the Scheduler can work flawlessly through
a massive load. Thus the plan is to use much more challenging parameters,
and then lean back and watch what happens....
2023-12-12 19:21:15 +01:00
b987aa2446 Scheduler-test: single invocation of a computation load
...can now be assembled easily from existing parts
...use this setup as the simple introductory example in SchedulerService_test
2023-12-12 18:17:03 +01:00
23a3a274ce Scheduler-test: investigate further breakage
...which turns out to be due to the DUMP-Statements,
which seem to create quite some contention on their own.

Test cases with very tight schedule will slip away then;
without print statement everything is GREEN now
2023-12-12 01:55:52 +01:00
69faaef8cd Scheduler-test: --- instrumentation ---
This partially reverts commit 72f11549e6.
"Chain-Load: Scheduler instrumentation for observation"

Hint: revert this changeset to re-introduce the print statements for diagnostic
2023-12-11 23:55:55 +01:00
da57e3dfcd Scheduler-test: ''can demonstrate running a synthetic load'' (closes #1346)
* added benchmark over synchronous execution as point of reference
 * verified running times and execution pattern
 * Scheduler **behaves as expected** for this example
2023-12-11 23:53:25 +01:00
347b9b24be Scheduler-test: complete and integrate computational load
This basically completes the Chain-Load framework;
a simple Scheduler integration run with all relevant features
can now be demonstrated.
2023-12-11 19:42:23 +01:00
db1ff7ded7 Scheduler-test: incremental calibration of both variants
- Generally speaking, the calibration uses current baseline settings;
- There are now two different load generation methods, thus both must be calibrated
- Performance contains some socked and non-linear effects, thus calibration
  should be done close to the work point, which can be achieved by incremental
  calibration until the error is < 5%

Interestingly, longer time-base values run slightly faster than predicted,
which is consistent with the expectation (socket cost). And using a larger
memory block increases time values, which is also plausible, since
cache effects will be diminishing
2023-12-11 04:43:05 +01:00
9ef8e78459 Scheduler-test: implement memory-accessing load
...use an array of volatiles, and repeatedly add neighbouring cells
...bake the base allocation size configurable, and tie the alloc to the scale-step
2023-12-11 03:13:28 +01:00
df4ee5e9c1 Scheduler-test: implement pure computation load
..initial gauging is a tricky subject,
since existing computer's performance spans a wide scale

Allowing
 - pre calibration -98% .. +190%
 - single run ±20%
 - benchmark ±5%
2023-12-11 03:10:42 +01:00
beebf51ac7 Scheduler-test: draft a configurable CPU load component
...which can be deliberately attached (or not attached) to the
individual node invocation functor, allowing to study the effect
of actual load vs. zero-load and worker contention
2023-12-10 19:58:18 +01:00
fcfdf97853 Chain-Load: prepare infrastructure for computational load
Within Chain-Load, the infrastructure to add this crucial feature
is minimal: each node gets a `weight` parameter, which is assigned
using another RandomDraw-Rule (by default `weight==0`).

The actual computation load will be developed as a separate component
and tied in from the node calculation job functor.
2023-12-09 03:13:48 +01:00
fe6f2af7bb Chain-Load: combine all exit-hashes into a single global hash
...during development of the Chain-Load, it became clear that we'll often
need a collection of small trees rather than one huge graph. Thus a rule
for pruning nodes and finishing graphs was added. This has the consequence
that there might now be several exit nodes scattered all over the graph;
we still want one single global hash value to verify computations,
thus those exit hashes must now be picked up from the nodes and
combined into a single value.

All existing hash values hard coded into tests must be updated
2023-12-09 02:36:14 +01:00
9e25283b72 Chain-Load: precise pre-roll for planning-job
...with this change, processing is ''ahead of schedule'' from the beginning,
which has the nice side effect that the problematic contention situation
with these very short computation jobs can not arise, and most of the schedule
is processed by a single worker.

Processing pattern is now pretty much as expected
2023-12-09 01:20:53 +01:00
1df328cfc1 Chain-Load: switch planning chunk-size from level to node
This is a trick to get much better scheduling and timing guesses.
Instead of targeting a specific level, rather a fixed number of nodes
is processed in each chunk, yet still always processing complete levels.

The final level number to expect can be retrieved from the chain-load graph.

With this refactoring, we can now schedule a wake-up job precisely
after the expected completion of the last level
2023-12-08 23:52:57 +01:00
34d6423660 Scheduler-test: **first successful complete run**
Scheduling a wake-up job behind the end of the planned schedule did the trick.
Sometimes there is ''strong contention'' immediately after full provision of the WorkForce,
but this seems to be as expected, since the »Jobs« currently used have no
actually relevant run time on their own. It is even more surprising that
the Capacity-control logic is able to cope with this situation in a matter
of just some milliseconds, bringing the average Lag at ~ 300µs
2023-12-08 04:22:12 +01:00
7eca3ffe42 Scheduler-test: a helper for one-time operations
Invent a special JobFunctor...
 - can be created / bound from a λ
 - self-manages its storage on the heap
 - can be invoked once, then discards itself

Intention is to pass such one-time actions to the Scheduler
to cause some ad-hoc transitions tied to curren circumstances;
a notable example will be the callback after load-test completion.
2023-12-08 03:16:57 +01:00