- repeated invocations of the same test setup for statistics
- the usual nasty 64-node graph with massive fork out
- limit concurrency to 4 cores
- tabulate data to look for clues regarding a trigger criteria
Hypothesis: The Scheduler slips off schedule when all of the
following three criteria are met:
- more than 55% glitches with Δ > 2ms
- σ > 2ms
- ∅Δ > 4ms