Commit graph

14 commits

Author SHA1 Message Date
bb2bbc0e02 Scheduler-test: verify adapted schedule with stress-factor
- schedule can now be adapted to concurrency and expected distribution of runtimes
- additional stress factor to press the schedule (1.0 is nominal speed)
- observed run-time now without Scheduler start-up and pre-roll
- document and verify computed numbers
2024-01-02 00:24:28 +01:00
813f8721f7 Scheduler-test: build adapted schedule
...based on the adapted time-factor sequence
implemented yesterday in TestChainLoad itself

- in this case, the TimeBase from the computation load is used as level speed
- this »base beat« is then modulated by the timing factor sequence
- working in an additional stress factor to press the schedule uniformly
- actual start time will be added as offset once the actual test commences
2024-01-01 22:48:27 +01:00
f4dd309476 Scheduler-test: change test setup to use a schedule table
...up to now, we've relied on a regular schedule governed solely
by the progression of node levels, with a fixed level speed
defaulting to 1ms per level.

But in preparation of stress tesging, we need a schedule adapted
to the expected distribution of computation times, otherwise
we'll not be able to factor out the actual computation graph
connectivity. The goal is to establish a distinctive
**breaking point** when the scheduler is unable to cope with
the provided schedule.
2024-01-01 21:07:16 +01:00
55cb028abf Scheduler-test: document and verify weight adapted timing
The helper developed thus far produces a sequence of
weight factors per level, which could then be multiplied
with an actual delay base time to produce a concrete schedule.

These calculations, while simple, are difficult to understand;
recommended to use the values tabulated in this test together
with a `graphviz` rendering of the node graph (🠲 `printTopologyDOT()`)
2023-12-31 21:59:41 +01:00
e9e7d954b1 Scheduler-test: formula to guess expense
The intention is to establish a theoretical limit for the expense,
given some degree of concurrency. In reality, the expense should always
be greater, since the time is not just split by the number of cores;
rather we need to chain up existing jobs of various weight on the available
cores (which is a special case of the box packing problem).

With this formula, an ideal weight factor can be determined for each level,
and then summing up the sequence of levels gives us a guess for a sensible
timing for the overall scheduler
2023-12-31 03:14:59 +01:00
409a60238a Scheduler-test: extract a generic grouping iterator
...so IterExplorer got yet another processing layer,
which uses the grouping mechanics developed yesterday,
but is freely configurable through λ-Functions.

At actual usage sit in TestChainLoad, now only the actual
aggregation computation must be supplied, and follow-up computations
can now be chained up easily as further transformation layers.
2023-12-31 00:41:01 +01:00
fec117039e Scheduler-test: need this group aggregation as pipeline rather
Yesterday I've written a simple loop-based implementation of
a grouping aggregation to count the node weights per level.

Unfortunately it turns out we'll use several flavours of this
and we'd have to chain up postprocessing -- thus from a usage perspective
it would be better to have the same functionality packaged as interator pipeline.
This turns out to be surprisingly tricky and there is no suitable library
function available, which means I'll have to write one myself.

This changeset is the first step into this direction: reformulate
the simple for-loop into a demand-driven grouping iterator
2023-12-30 02:15:38 +01:00
f04035a030 Scheduler-test: draft calculation of level-weight based schedule
...the idea is to use the sum of node weights per level
to create a schedule, which more closely reflects the distribution
of actual computation time. Hopefully such a schedule can then be
squeezed or stretched by a time factor to find out a ''breaking point'',
at which the Scheduler is no longer able to keep up.
2023-12-29 01:07:26 +01:00
af680cdfd9 Scheduler-test: adapt tests to changed logic at entrance
- now there can not be any direct dispatch anymore when entering events
- thus there is no decision logic at entrance anymore
- rather the work-function implementation moved down into Layer-2
- so add a unit-test like coverage there (integration in SchedulerService_test)
2023-12-27 00:16:03 +01:00
dedfbf4984 Scheduler-test: investigate planning failure
- fix mistake in schdule time for planning chunks (must use start, not end of chunk)
- allow to configure the heuristics for pre-roll (time reserved for planning a node)
2023-12-23 21:38:51 +01:00
90ab20be61 Scheduler-test: press harder with long and massive graph
...observing multiple failures, which seem to be interconnected

- the test-setup with the planning chunk pre-roll is insufficient

- basically it is not possible to perform further concurrent planning,
  without getting behind the actual schedule; at least in the setup
  with DUMP print statements (which slowdown everything)

- muliple chained re-entrant calls into the planning function can result

- the **ASSERTION in the Allocator** was triggered again

- the log+stacktrace indicate that there **is still a Gap**
  in the logic to protect the allocations via Grooming-Token
2023-12-22 00:33:51 +01:00
2cd51fa714 Scheduler-test: fix out-of-bound access
...causing the system to freeze due to excess memory allocation.

Fortunately it turned out this was not an error in the Scheduler core
or memory manager, but rather a sloppiness in the test scaffolding.
However, this incident highlights that the memory manager lacks some
sanity checks to prevent outright nonsensical allocation requests.

Moreover it became clear again that the allocation happens ''already before''
entering the Scheduler — and thus the existing sanity check comes too late.
Now I've used the same reasoning also for additional checks in the allocator,
limiting the Epoch increment to 3000 and the total memory allocation to 8GiB

Talking of Gibitbytes...
indeed we could use a shorthand notation for that purpose...
2023-12-21 20:25:43 +01:00
c4807abf8a Scheduler-test: planning for stress-tests 2023-12-19 21:06:23 +01:00
9db341bd8b Scheduler: plan for integration
identified three distinct tasks
- build the external API
- establish component integration
- performance testing
2023-10-20 00:59:50 +02:00