... so this (finally) is the missing cornerstone
... traverse the calculation graph and generate render jobs
... provide a chunk-wise pre-planning of the next batch
... use a future to block the (test) thread until completed
- test setup without actual scheduler
- wire the callbacks such to verify
+ all nodes are touched
+ levels are processed to completion
+ the planning chunk stops at the expected level
+ all node dependencies are properly reported through the callbacks
- decided to abstract the scheduler invocations as λ
- so this functor contains the bare loop logic
Investigation regarding hash-framework:
It turns out that boost::hash uses a different hash_combine,
than what we have extracted/duplicated in lib/hash-value.hpp
(either this was a mistake, or boost::hash did use this weaker
function at that time and supplied a dedicated 64bit implementation later)
Anyway, should use boost::hash for the time being
maybe also fix the duplicated impl in lib/hash-value.hpp
- use a ''special encoding'' to marshal the specific coordinates for this test setup
- use a fixed Frame-Grid to represent the ''time level''
- invoke hash calculation through a specialised JobFunctor subclass
The number of nodes was just defined as template argument
to get a cheap implementation through std::array...
But actually this number of nodes is ''not a characteristics of the type;''
we'd end up with a distinct JobFunctor type for each different test size,
which is plain nonsensical. Usage analysis reveals, now that the implementation
is ''basically complete,'' that all of the topology generation and statistic
calculation code does not integrate deeply with the node storage, but
rather just iterates over all nodes and uses the ''first'' and ''last'' node.
This can actually be achieved very easy with a heap-allocated plain array,
relying on the magic of lib::IterExplorer for all iteration and transformation.
- use a dedicated context "dropped off" the TestChainLoad instance
- encode the node-idx into the InvocationInstanceID
- build an invocation- and a planning-job-functor
- let planning progress over an lib::UninitialisedStorage array
- plant the ActivityTerm instances into that array as Scheduling progresses
Since Chain-Load shall be used for performance testing of the scheduler,
we need a catalogue of realistic load patterns. This extended effort
started with some parameter configurations and developed various graph
shapes with different degree of connectivity and concurrency, ranging
from a stable sequence of very short chains to large and excessively
interconnected dependency networks.
Through introduction of a ''pruning rule'', it is possible
to create exit nodes in the middle of the graph. With increased
intensity of pruning, it is possible to ''choke off'' the generation
and terminate the graph; in such a case a new seed node is injected
automatically. By combination with seed rules, an equilibrium of
graph start and graph termination can be achieved.
Following this path, it should be possible to produce a pattern,
which is random but overall stable and well suited to simulate
a realistic processing load.
However, finding proper parameters turns out quite hard in practice,
since the behaviour is essentially contingent and most combinations
either lead to uninteresting trivial small graph chunks, or to
large, interconnected and exponentially expanding networks
... seeding happens at random points in the middle of the chain
... when combined with reduction, the resulting processing pattern
resembles the real processing pattern of media calcualtions
... special rule to generate a fixed expansion on each seed
... consecutive reductions join everything back into one chain
... can counterbalance expansions and reductions
...as it turns out, the solution embraced first was the cleanest way
to handle dynamic configuration of parameters; just it did not work
at that time, due to the reference binding problem in the Lambdas.
Meanwhile, the latter has been resolved by relying on the LazyInit
mechanism. Thus it is now possible to abandon the manipulation by
side effect and rather require the dynamic rule to return a
''pristine instance''.
With these adjustments, it is now possible to install a rule
which expands only for some kinds of nodes; this is used here
to crate a starting point for a **reduction rule** to kick in.
- present the weight centres relative to overall level count
- detect sub-graphs and add statistics per subgraph
- include an evaluation for ''all nodes''
- include number of levels and subgraphs
- iterate over all nodes and classify them
- group per level
- book in per level statistics into the Indicator records
- close global averages
...just coded, not yet tested...
The graph will be used to generate a computational load
for testing the Scheduler; thus we need to compute some
statistical indicators to characterise this load.
As starting point sum counts and averages will be aggregated,
accounting for particular characterisation of nodes per level.
It seams indicated to verify the generated connectivity
and the hash calculation and recalculation explicitly
at least for one example topology; choosing a topology
comprised of several sub-graphs, to also verify the
propagation of seed values to further start-nodes.
In order to avoid addressing nodes directly by index number,
those sub-graphs can be processed by ''grouping of nodes'';
all parts are congruent because topology is determined by
the node hashes and thus a regular pattern can be exploited.
To allow for easy processing of groups, I have developed a
simplistic grouping device within the IterExplorer framework.
- with the new pruning option, start-Nodes can now be anywhere
- introduce predicates to detect start-Nodes and exit-Nodes
- ensure each new seed node gets the global seed on graph construction
- provide functionality to re-propagate a seed and clear hashes
- provide functionality to recalculate the hashes over the graph
this is only a minor rearrangement in the Algorithm,
but allows to re-boot computation should node connectivity
go to zero. With current capabilities, this could not happen,
but I'm considering to add a »pruning« parameter to create the
possibility to generate multiple shorter chains instead of one
complete chain -- which more closely emulates reality for
Scheduler load patterns.
RandomDraw as a library component was extracted and (grossly) augmented
to cut down the complexity exposed to the user of TestChainLoad.
To control the generated topology, random-selected parameters
must be configured, defining a probability profile; while
this can be achieved with simple math, getting it correct
turned out surprisingly difficult.
...start with putting the topology generator to work
- turns out it is still challenging to write the ctrl-rules
- and one example tree looked odd in the visualisation
- which (on investigation) indicated unsound behaviour
...this is basically harmless, but involves an integer wrap-around
in a variable not used under this conditions (toReduce), but also
a rather accidental and no very logical round-up of the topology.
With this fix, the code branch here is no longer overloaded with two
distinct concerns, which I consider an improvement
by default, a linear chain without any forking is generated,
and the result hash is computed by hash-chaining from the seed.
Verify proper connections and validate computed hash
..as can be expected, had do chase down some quite hairy problems,
especially since consumption of the fixed amount of nodes is not
directly linked to the ''beat'' of the main loop and thus boundary
conditions and exhausted storage can happen basically anywhere.
Used a simple expansion rule and got a nod graph,
which looks coherent in DOT visualisation.
writing a control-value rule for topology generation typically
involves some modulus and then arthmetic operations to map
only part of the value range to the expected output range.
These calculations are generic, noisy and error-prone.
Thus introduce a helper type, which allows the client just
to mark up the target range of the provided value to map and
transform to the actually expected result range, including some
slight margin to absorb rounding errors. Moreover, all calculations
done in double, to avoid the perils of unsigned-wrap-around.
...these were developed driven by the immediate need
to visualise ''random generated computation patterns''
for ''Scheduler load testing.''
The abstraction level of this DSL is low
and structures closely match some clauses of the DOT language;
this approach may not yet be adequate to generate more complex
graph structures and was extracted as a starting point
for further refinements....
With all the preceding DSL work, this turns out to be surprisingly easy;
the only minor twist is the grouping of nodes into (time)levels,
which can be achieved with a "lagging" update from the loop body
Note: next step will be to extract the DSL helpers into a Library header
...using a pre-established example as starting point
It seems that building up this kind of generator code
from a set of free functions in a secluded namespace
is the way most suitable to the nature of the C++ language
..the idea is to generate a Graphviz-DOT diagram description
by traversing the internal data structures of TestChainLoad.
- refreshed my Graphviz knowledge
- work out a diagram scheme that can be easily generated
- explore ways to structure code generation as a DSL to keep it legible
...introduce statistical control functions (based on hash)
...add processing stage for current set of nodes
...process forking, reduction and injection of new nodes
- use a specialised class, layered on top of std::array
- use additional storage to mark filling degree
- check/fail on link owerflow directly there
We still use fixed size inline storage for the node links,
yet adding this comparatively small overhead in storage helps
getting the code simpler and adding links is now constant-complexity
A »Node« represents one junction point in the dependency graph,
knows his predecessors and successors and carries out one step
of the chained hash calculation.
...refine the handling of FrameRates close to the definition bounds
...implement the actual rule to scale allocator capacity on announcement
...hook up into the seedCalcStream() with a default of +25FPS
+ test coverage
The test case "scheduleRenderJob()" -- while deliberately operated
quite artificially with a disabled WorkForce (so the test can check
the contents in the queue and then progress manually -- led to discovery
of an open gap in the logic: in the (rare) case that a new task is
added ''from the outside'' without acquiring the Grooming-Token, then
the new task could sit in the entrace queue, in worst case for 50ms,
until the next Scheduler-»Tick« routinely sweeps this queue. Under
normal conditions however, each dispatch of another activity will
also sweep the entrance queue, yet if there happens to be no other
task right now, a new task could be stuck.
Thinking through this problem also helped to amend some aspects
of Grooming-Token handling and clarified the role of the API-functions.
...especially to prevent a deadline way too far into the future,
since this would provoke the BlockFlow (epoch based) memory manager
to run out of space.
Just based on gut feeling, I am now imposing a limit of 20seconds,
which, given current parametrisation, with a minimum spacing of 6.6ms
and 500 Activities per Block would at maximum require 360 MiB for
the Activities, or 3000 Blocks. With *that much* blocks, the
linear search would degrade horribly anyway...
WorkForce scales down automatically after 2 seconds when
workers fall idle; thus we need to step up automatically
with each new task.
Later we'll also add some capacity management to both the
LoadController and the Job-Planning, but for now this rather
crude approach should suffice.
NOTE: most of the cases in SchedulerService_test verify parts
of the component integration and thus need to bypass this
automatism, because the test code wants to invoke the
work-Function directly (without any interference
from running workers)
While building increasingly complex integration tests for the Scheduler,
it turns out helpful to be able to manipulate the "full concurreency"
as used by Scheduler, WorkForce and LoadController.
In the current test, I am facing a problem that new entries from the
threadsafe entrance queue are not propagated to the priority queue
soon enough; partly this is due to functionality still to be added
(scaling up when new tasks are passed in) -- but this will further
complicate the test setup.
The invocation structure is effectively determined by the
Activity-chain builder from the Activity-Language; but, taking
into account the complexity of the Scheduler code developed thus far,
it seems prudent to encapsulate the topic of "Activities" altogether
and expose only a convenience builder-API towards the Job-Planning
The problem with passing the deadline was just a blatant symptom
that something with the overall design was not quite right, leading
to mix-up of interfaces and implementation functions, and more and more
detail parameters spreading throughout the call chains.
The turning point was to realise the two conceptual levels
crossing and interconnected within the »Scheduler-Service«
- the Activity-Language describes the patterns of processing
- the Scheduler components handle time-bound events
So by turning the (previously private) queue entry into an
ActivationEvent, the design could be balanced.
This record becomes the common agens within the Scheduler,
and builds upon / layers on top of the common agens of the
Language, which is the Activity record.
the attempt to integrate additional deadline and significance parameters
unveils a design problem due to the layering of contexts
- the Activity-Language attempts to abstract away the ''Scheduler mechanics''
- but this implementation logic now needs to pass additional parameters
- and notably there is the possibility of direct re-scheduling from within
the Activity-Dispatch
The symptom of this problem is that it's no longer possible
to implement the ExecutionCtx.post() function in the real Scheduler-context
...it is clear that there must be a way to flush the scheduler queues
an thereby silently drop any obsoleted or irrelevant entries. This topic
turns out to be somewhat involved, as it requires to consider the
deadline (due to the memory management, which is based on deadlines).
Furthermore there is a relation to yet another challenging conceptual
requirement, which is the support for other operation modes beyond
just time-bound rendering; these concerns make it desirable to
expand the internal representation of entries in the queue.
Concerns regarding performance are postponed deliberately,
until we can demonstrate the Scheduler-Service running under
regular operational conditions.
This is the first kind of integration,
albeit still with a synthetic load.
- placed two excessive load peaks in the scheduling timeline
- verified load behaviour
- verified timings
- verified that the scheduler shuts down automatically when done
- sample distance to scheduler head whenever a worker asks for work
- moving average with N = worker-pool size and damp-factor 2
- multiply with the current concurrency fraction
as an aside, the header lib/test/microbenchmark.hpp
turns out to be prolific for this kind of investigation.
However, it is somewhat obnoxious that the »test subject«
must expose the signature <size_t(size_t)>.
Thus, with some metaprogramming magic, an generic adaptor
can be built to accept a range of typical alternatives,
and even the quite obvious signature void(void).
Since all these will be wrapped directly into a lambda,
the optimiser will remove these adaptations altogether.
- An important step towards a complete »Scheduler Service«
- Correct timing pattern could be verified in detail by tracing
- Spurred some further concept and design work regarding Load-control
- draft the duty cycle »tick«
- investigate corner cases of state updates and allocation managment
- implement start and forcible stop of the scheduler service
Obviously the better choice and a perfect fit for our requirements;
while the system-clock may jump and even move backwards on time service
adjustments, the steady clock just counts the ticks since last boot.
In libStdC++ both are implemented as int64_t and use nanoseconds resolution
- Ensure the grooming-token (lock) is reliably dropped
- also explicitly drop it prior to trageted sleeps
- properly signal when not able to acquire the token before dispatch
- amend tests broken by changes since yesterday
Notably the work-function is now completely covered, by adding
this last test, and the detailed investigations yesterday
ultimately unveiled nothing of concern; the times sum up.
Further reflection regarding the overall concept led me
to a surprising solution for the problem with priority classes.
...especially for the case »outgoing to sleep«
- reorganise switch-case to avoid falling through
- properly handle the tendedNext() predicate also in boundrary cases
- structure the decision logic clearer
- cover the new behaviour in test
Remark: when the queue falls empty, the scheduler now sends each
worker once into a targted re-shuffling delay, to ensure the
sleep-cycles are statistically evenly spaced
...there seemed to be an anomaly of 50...100µs
==> conclusion: this is due to the instrumentation code
- it largely caused by the EventLog, which was never meant
to be used in performance-critical code, and does hefty
heap allocations and string processing.
- moreover, there clearly is a cache-effect, adding a Factor 2
whenever some time passed since the last EventLog call
==> can be considered just an artifact of the test setup and
will have no impact on the scheduler
remark: this commit adds a lot of instrumentation code
To cover the visible behaviour of the work-Function,
we have to check an amalgam of timing delays and time differences.
This kind of test tends to be problematic, since timings are always
random and also machine dependent, and thus we need to produce pronounced effects
...to make that abundantly clear: we do not aim at precision timing,
rather the goal is to redistribute capacity currently not usable...
Basically we're telling the worker "nothing to do right now, sorry,
but check back in <timespan> because I may need you then"
Workers asking for the next task are classified as belonging
to some fraction of the free capacity, based on the distance
to the closest next Activity known to the scheduler
...to bring it more in line with all the other calls dealing with Activity*
...allows also to harmonise the ActivityLang::dispatchChain()
...and to compose the calls in Scheduler directly
NOTE: there is a twist: our string-formatting helper did not render
custom string conversions for objects passed as pointer. This was a
long standing problem, caused by ambiguous templates overloads;
now I've attempted to solve it one level more down, in util::StringConv.
This solution may turn out brittle, since we need to exclude any direct
string conversion, most notably the ones for C-Strings (const char*)
In case this solution turns out unsustainable, please feel free
to revert this API change, and return to passing Activity& in λ-post,
because in the end this is cosmetics.
- organise by principles rather than implementing a mechanism
- keep the first version simple yet flexible
- conduct empiric research under synthetic load
Basic scheme:
- tend for next
- classify free capacity
- scattered targeted wait
The Activity-Language can be defined by abstracting away
some crucial implementation functionality as part of an generic
»ExecutionCtx«, which in the end will be provided by the Scheduler.
But how actually?
We want to avoid unnecessary indirections, and ideally we also want
a concise formulation in-code. Here I'm exploring the idea to let the
scheduler itself provide the ExecutionCtx-operations as member functions,
employing some kind of "compile-time duck-typing"
This seems to work, but breaks the poor-man's preliminary "Concept" check...
The »Scheduler Service« will be assembled
from the components developed during the last months
- Layer-1
- Layer-2
- Activity-Language
- Block-Flow
- Work-Force
* the implementation logic of the Scheduler is essentially complete now
* all functionality necessary for the worker-function has been demonstrated
As next step, the »Scheduler Service« can be assembled from the two
Implementation Layers, the Activity-Language and the `BlockFlow` allocator
This should then be verified by a multi-threaded integration test...
This central operation sits at a crossroad and is used
- from external clients to fed new work to the Scheduler
- from Workers to engage into execution of the next Activity
- recursively from the execution of an Activity-chain
From these requirements the semantics of behaviour can be derived
regarding the GroomingToken and the result values, which indicate
when follow-up work should be processed
Ensure the GroomingToken mechanism indeed creates an
exclusive section protected against concurrent corruption:
Use a without / with-protection test and verify
the results are exact vs. grossly broken
T thread holding the »Grooming Token" is permitted to
manipulate scheduler internals and thus also to define new
activities; this logic is implemented as an Atomic lock,
based on the current thread's ID.
Notably both Layers are conceived as functionality providers;
only at Scheduler top-Level will functionality be combined with
external dependencies to create the actual service.
At first sight, this seems confusing; there is a time window,
there is sometimes a `when` parameter, and mostly a `now` parameter
is passed through the activation chain.
However, taking the operational semantics into account, the existing
definitions seem to be (mostly) adequate already: The scheduler is
assumed to activate a chain only ''when'' the defined start time is reached.
As follow-up to the rework of thread-handling, likewise also
the implementation base for locking was switched over from direct
usage of POSIX primitives to the portable wrappers available in
the C++ standard library. All usages have been reviewed and
modernised to prefer λ-functions where possible.
With this series of changes, the old threadpool implementation
and a lot of further low-level support facilities are not used
any more and can be dismantled. Due to the integration efforts
spurred by the »Playback Vertical Slice«, several questions of
architecture could be decided over the last months. The design
of the Scheduler and Engine turned out different than previously
anticipated; notably the Scheduler now covers a wider array of
functionality, including some asynchronous messaging. This has
ramifications for the organisation of work tasks and threads,
and leads to a more deterministic memory management. Resource
management will be done on a higher level, partially superseding
some of the concepts from the early phase of the Lumiera project.
This is Step-2 : change the API towards application
Notably all invocation variants to support member functions
or a reference to bool flags are retracted, since today a
λ-binding directly at usage site tends to be more readable.
The function names are harmonised with the C++ standard and
emergency shutdown in the Subsystem-Runner is rationalised.
The old thread-wrapper test is repurposed to demonstrate
the effectiveness of monitor based locking.
After the fundamental switch from POSIX to the C++14 wrappers
the existing implementation of the Monitor can now be drastically condensed,
removing several layers of indirection. Moreover, all signatures
shall be changed to blend in with the names and patterns established
by the C++ standard.
This is Step-1 : consolidate the Implementation.
(to ensure correctness, the existing API towards application code was retained)
The WorkForce (passive worker pool) has been coded just recently,
and -- in anticipation of this refactoring -- directly against std::thread
instead of using the old framework.
...the switch is straight-forward, using the default case
...add the ability to decorate the thread-IDs with a running counter
After quite some detours, with this take I'm finally able to
provide a stringent design to embody all the variants of thread start
encountered in practice in the Lumiera code base.
Especially the *self-managed* thread is now represented as a special-case
of a lifecycle-hook, and can be embodied into a builder front-end,
able to work with any client-provided thread-wrapper subclass.
FamilyMember::allocateNextMember() was actually a post-increment,
so (different than with TypedCounter) here no correction is necessary
As an asside, WorkForce_test is sometimes unstable immediately after a build.
Seemingly a headstart of 50µs is not enough to compensate for scheduler leeway
Over time, a collection of microbenchmark helper functions was
extracted from occasional use -- including a variant to perform
parallelised microbenchmarks. While not used beyond sporadic experiments yet,
this framework seems a perfect fit for measuring the SyncBarrier performance.
There is only one catch:
- it uses the old Threadpool + POSIX thread support
- these require the Threadpool service to be started...
- which in turn prohibits using them for libary tests
And last but not least: this setup already requires a barrier.
==> switch the existing microbenchmark setup to c++17 threads preliminarily
(until the thread-wrapper has been reworked).
==> also introduce the new SyncBarrier here immediately
==> use this as a validation test of the setup + SyncBarrier
The investigation for #1279 leads to the following conclusions
- the features and the design of our custom thread-wrapper
almost entirely matches the design chosen meanwhile by the C++ committee
- the implementation provided by the standard library however uses
modern techniques (especially Atomics) and is more precisely worked out
than our custom implementation was.
- we do not need an *active* threadpool with work-assignment,
rather we'll use *active* workers and a *passive* pool,
which was easy to implement based on C++17 features
==> decision to drop our POSIX based custom implementation
and to retrofit the Thread-wrapper as a drop-in replacement
+++ start this refactoring by moving code into the Library
+++ create a copy of the Threadwrapper-code to build and test
the refactorings while the application itself still uses
existing code, until the transition is complete
While in principle it would be possible (and desirable)
to control worker behaviour exclusively through the Work-Functor's return code,
in practice we must concede that Exceptions can always happen from situations
beyond our control. And while it is necessary for the WorkForce-dtor to
join and block (we can not just pull away the resources from running threads),
the same destructor (when called out of order) must somehow be able
at least to ask the running threads to terminate.
Especially for unit tests this becomes an obnoxious problem -- otherwise
each test failure would cause the test runner to hang.
Thus adding an emergency halt, and also improve setup for tests
with a convenience function to inject a work-function-λ
No new functionality, and implementation works as expected.
This test case covers an especially tricky setup, where a calculation
shall be triggered from an external event, while ensuring that the actual
processing can start only after also the regular time-bound scheduling
has taken place (this might be used to prevent an unexpectedly early
external signal to cause writing into an output buffer before the
defined window of data delivery)
...based on the new ability in the ActivityDetector, we can now assign
a custom λ, which deflects back the ctx.post() call into the ActivityLang
instance used for this test case.
While the previously seen behaviour was correct, it was not the call sequence
expected in the real implementation; with this change, on the main-chain
activation the post() now immediately dispatches the notification, which in turn
dispatches the rest of the chain, so that the JobFunctor is indeed
called in this second test case as expected
Up to now, the DiagnosticFun mock in ActivityDetector only
created an EventLog entry on invocation and was able to retunr
a canned result value. Yet for the job invocation scenario test,
it would be desirable to hook-in a λ with a fake implementation
into the ExecutionContext. As a further convenience, the
return value is now default initialised, instead of being
marked as uninitialised until invocation of "returning(val)"
...seems to work, but not really happy with the test setup,
since in real usage the post()-calls would dispatch, while here,
using the ActivityDetector, these calls just log invoation,
and thus the activation is not passed on
...regarding the kind of activity (the verb),
and also for some special case access of payload data;
deliberately asserting the correct verb, but no mandatory check,
since this whole Activity-Language is conceived as cohesive
and essentially sealed (not meant to be extended)
...to show in test that indeed the actual time is retrieved on each activation,
we can assign a λ -- which is rigged to increase the time on each access
It is not sufficient just to pass this "current time" as parameter
into the ActivityLang::dispatchChain(), since some Activities within
this chain will essentially be long-running (think rendering); thus
we need a real callback from within the chain. The obvious solution
is to make this part of the Execution Context, which is an abstraction
of the scheduler environment anyway
...turns out there is still a lot of leeway in the possible implementation,
and seemingly it is too early to decide which case to consider the default.
Thus I'll proceed with the drafted preliminary solution...
- on primary-chain, an inhibited Gate dispatches itself into future for re-check
- on Notification, activation happens if and only if this very notification opens the Gate
- provide a specifically wired requireDirectActivation() to allow enforcing a minimal start time
...assembled from parts already implemented
TODO
- need a way to access the »current scheduler time«
- need builder extension points to connect notifications
...this completes the basic setup
- Term builder mechanism working properly
- Memory allocator behaves sane
- the simple default wiring allows to invoke a Job
Solved by special treatment of a notification, which happens
to decrement the latch to zero: in this case, the chain is
dispatched, but also the Gate is locked permanently to block
any further activations scheduled or forwareded otherwise
TODO: while correct as implemented, the handling of the
notification seems questionable, since re-scheduling the chain immediately
may lead to multiple invocations of the chain, since it might have been "spinned"
and thus re-scheduled already, and we have no way to find out about that
...can not take a shortcut here, since the timing information
embedded into the POST-Activity must somehow be transported
to the Scheduler; key point to note is that the chain will
be performed in »management mode« (single threaded)
...attempt to get this intricate state machine sorted out
Notification turned out quite tricky, since it may emanate
from a concurrently executed phase and we try to avoid having
to protect the gate directly with a lock; rather we re-dispatch
the notification through the queue, which indirectly also ensures
that the worker de-queuing the NOTIFY-Activity operates in
management mode (single threaded, holding the GroomingToken)
Decision how to handle a failed Gate-check
- spin forward (re-scheduler) by some time amount
- this spin-offset parameter is retrieved from the Execution Context
- thus it will be some kind of engine parameter
With these determinations and the framework for the Execution Context
it is now possible to code up the logic for Gate check, which in turn
can then be verified by the watchGate diagnostics