f23b482d7d adjust test code to get MockElm log joining to PASS
the "log joining" functionality was already implemented
and covered with the generic event log facility, but this test
here was drafted even before that, meaning that the semantics
of matchingn on the log, especially on events, as been
implemented slightly different than planned
2015-12-26 04:55:00 +01:00
b9ef66b221 provide and cover a mock implementation of receiving notification messages 2015-12-26 04:40:38 +01:00
4d1fcd6dcb implement logging/identification of mock UI elements 2015-12-25 00:41:14 +01:00
af98d75da4 consider the bus side of the generic UI base in more detail
especially define the outline of the bus communication
and connection management
2015-12-18 01:02:19 +01:00
59c2d2b482 WIP: start implementing the generic UI base 2015-12-16 23:24:11 +01:00
a9a6aabcbc return to topic: UI element protocol
next step will be to rig the mock element and set up
and cover the basic / generic element behaviour

This changeset
 - adapts the (planned) unit test to the semantic of
   the EventLog, which is now fully implemented

 - adjusts the function names on the public Tangible interface,
   to be better in line with the naming convention of the
   corrsponding operations on the UI-Bus:

   * "mark" operations are towards the UI element
   * "note" messages are from the UI element towards some
     state manager, which can be reached via the bus
2015-12-16 02:16:53 +01:00
ef1b640ffb adapt API to the workings of log joining (as defined/planned)
indeed I flipped the meaning, with respect to the previous plan.
It seems more natural to "join this into another log"
2015-12-06 04:30:39 +01:00
b2542b86f7 stub and rectify interfaces defined thus far.
...compilation PASS again
2015-11-28 23:50:56 +01:00
d4c017fa73 WIP: settle on the Tangible interface 2015-11-28 21:43:09 +01:00
9af20b7cf6 WIP: BusTerm needs to be a concrete class
...providing the standard implementation of UI-Bus connectivity.
It seems reasonable to place all of the UI-Bus implementation into
a single translation unit
2015-11-28 20:55:28 +01:00
25805635ff WIP: test-driven brainstorming -- a framework for event log verification
this is a recipe for writing UI related tests
2015-11-27 02:38:23 +01:00
42c2569bb8 test driven planning
next steps will be to invent a mock UI element
and then to wire and operat this mock through the UI-Bus
2015-11-26 22:23:43 +01:00