The behaviour seems consistent and the schedule breaks at the expected point. At first sight, concurrency seems slightly to low; detailed investigation however shows that this is due to the structure of the load graph, and in fact the run time comes close to optimal values. |
||
|---|---|---|
| .. | ||
| gear | ||
| mem | ||
| DIR_INFO | ||