The helper developed thus far produces a sequence of weight factors per level, which could then be multiplied with an actual delay base time to produce a concrete schedule. These calculations, while simple, are difficult to understand; recommended to use the values tabulated in this test together with a `graphviz` rendering of the node graph (🠲 `printTopologyDOT()`) |
||
|---|---|---|
| .. | ||
| draw | ||
| DIR_INFO | ||
| empty.html | ||
| InterfaceConcept_Varga.mm | ||
| renderengine.html | ||
| thinkPad.ichthyo.mm | ||
| uml | ||
| workflow.mm | ||