The last round of refactorings yielded significant improvements - parallelisation now works as expected - processing progresses closer to the schedule - run time was reduced The processing load for this test is tuned in a way to overload the scheduler massively at the end -- the result must be correct non the less. There was one notable glitch with an assertion failure from the memory manager. Hopefully I can reproduce this by pressing and overloading the Scheduler more... |
||
|---|---|---|
| .. | ||
| draw | ||
| DIR_INFO | ||
| empty.html | ||
| InterfaceConcept_Varga.mm | ||
| renderengine.html | ||
| thinkPad.ichthyo.mm | ||
| uml | ||
| workflow.mm | ||