The behaviour seems consistent and the schedule breaks at the expected point. At first sight, concurrency seems slightly to low; detailed investigation however shows that this is due to the structure of the load graph, and in fact the run time comes close to optimal values. |
||
|---|---|---|
| .. | ||
| 2023-12-09.Scheduler-Integration | ||
| 2024-04-08.Scheduler-LoadTest | ||
| DIR_INFO | ||