LUMIERA.clone/doc
Ichthyostega ef4401a185 Timeline: rearrange drawing in accordance to construction
...since the construction is determined now (and was worked out in FreeCAD),
the SVG will serve to document the construction; thus the drawing
primitives are rearranged to use the unscaled reference coordinates
to be extracted from the FreeCAD document; all scaling and placement
in the SVG document will be applied through common groups.
2023-02-25 15:32:35 +01:00
..
design ElementBox: extract builder qualifier support as library implementation 2022-08-28 23:36:27 +02:00
devel Timeline: rearrange drawing in accordance to construction 2023-02-25 15:32:35 +01:00
technical ElementBox: establish basic styling 2022-10-02 03:57:16 +02:00
user C++17: some related clean-up 2020-02-21 23:55:09 +01:00
.gitignore infrastructure to test the documentation standalone 2018-11-01 04:38:17 +01:00
DIR_INFO spelling fixes 2011-02-06 02:12:55 +01:00
index.txt Global-Layer-Renaming: fix remaining textual usages and IDs in the code 2018-12-10 00:09:56 +01:00
SConscript DOC: reorganise the Doxygen configuration and structure 2013-10-25 06:34:38 +02:00