...especially to prevent a deadline way too far into the future,
since this would provoke the BlockFlow (epoch based) memory manager
to run out of space.
Just based on gut feeling, I am now imposing a limit of 20seconds,
which, given current parametrisation, with a minimum spacing of 6.6ms
and 500 Activities per Block would at maximum require 360 MiB for
the Activities, or 3000 Blocks. With *that much* blocks, the
linear search would degrade horribly anyway...
The invocation structure is effectively determined by the
Activity-chain builder from the Activity-Language; but, taking
into account the complexity of the Scheduler code developed thus far,
it seems prudent to encapsulate the topic of "Activities" altogether
and expose only a convenience builder-API towards the Job-Planning
The problem with passing the deadline was just a blatant symptom
that something with the overall design was not quite right, leading
to mix-up of interfaces and implementation functions, and more and more
detail parameters spreading throughout the call chains.
The turning point was to realise the two conceptual levels
crossing and interconnected within the »Scheduler-Service«
- the Activity-Language describes the patterns of processing
- the Scheduler components handle time-bound events
So by turning the (previously private) queue entry into an
ActivationEvent, the design could be balanced.
This record becomes the common agens within the Scheduler,
and builds upon / layers on top of the common agens of the
Language, which is the Activity record.
- Ensure the grooming-token (lock) is reliably dropped
- also explicitly drop it prior to trageted sleeps
- properly signal when not able to acquire the token before dispatch
- amend tests broken by changes since yesterday
* the implementation logic of the Scheduler is essentially complete now
* all functionality necessary for the worker-function has been demonstrated
As next step, the »Scheduler Service« can be assembled from the two
Implementation Layers, the Activity-Language and the `BlockFlow` allocator
This should then be verified by a multi-threaded integration test...
This central operation sits at a crossroad and is used
- from external clients to fed new work to the Scheduler
- from Workers to engage into execution of the next Activity
- recursively from the execution of an Activity-chain
From these requirements the semantics of behaviour can be derived
regarding the GroomingToken and the result values, which indicate
when follow-up work should be processed
Ensure the GroomingToken mechanism indeed creates an
exclusive section protected against concurrent corruption:
Use a without / with-protection test and verify
the results are exact vs. grossly broken
T thread holding the »Grooming Token" is permitted to
manipulate scheduler internals and thus also to define new
activities; this logic is implemented as an Atomic lock,
based on the current thread's ID.
Notably both Layers are conceived as functionality providers;
only at Scheduler top-Level will functionality be combined with
external dependencies to create the actual service.