LUMIERA.clone/doc/devel/draw/StaveBracket.svg
Ichthyostega ef4401a185 Timeline: rearrange drawing in accordance to construction
...since the construction is determined now (and was worked out in FreeCAD),
the SVG will serve to document the construction; thus the drawing
primitives are rearranged to use the unscaled reference coordinates
to be extracted from the FreeCAD document; all scaling and placement
in the SVG document will be applied through common groups.
2023-02-25 15:32:35 +01:00

239 lines
6.8 KiB
XML